Off grid backup inverter automatic transfer switch

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9711967
SERIAL NO

14068507

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power conversion system for use with an alternate energy source includes a first inverter, a battery, and a second inverter, each of which receives power from the alternate energy source. The output of the first inverter and the grid are each connected to at least one electrical load via a load center. The battery is charged via a charger connected to the alternate energy source. This stored energy powers a selected portion of the electrical loads during a failure of the utility grid. The second inverter is connected between the battery and a transfer switch. During normal grid operation, the second inverter is disabled and the transfer switch connects the load center to the selected electrical loads. During a failure of the utility grid, the first inverter is disabled, the second inverter is enabled, and the transfer switch connects the second inverter to the selected electrical loads.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RELIANCE CONTROLS CORPORATION2001 YOUNG COURT RACINE WI 53404

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Czarnecki, Neil A Mt. Pleasant, US 52 544

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00