Method for connecting the conductors of a flexible bonded (equipotential) connection layer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9711925
APP PUB NO 20150107893A1
SERIAL NO

14396592

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method electrically connects by crimping electrical conductors in a connector for equipotential connection of a planar and flexible layer formed by the conductors, to metal components. The method includes positioning the electrical conductors in individual longitudinal and parallel cells which are formed between two planar walls of the connector, crimping the conductors crimped in a crimping zone by simultaneous transverse punching of at least one wall of the connector, and forming by the transverse punching at least one corresponding transverse groove line on the at least one connector wall and, by load transfer, on each of the conductors to electrically connect the conductors.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFRAN ELECTRICAL & POWERPARC D'ACTIVITÉ ANDROMÈDE 1 RUE LOUIS BLÉRIOT CS 80049 31702 BLAGNAC CEDEX 31702

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ayme, Arnaud Camille Toulouse, FR 7 32
Barraud, Florian Meilhac, FR 1 1
Biesse, Jean-Luc Saint Lieux les Lavaur, FR 7 24
Boutot, David Lascaux, FR 3 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00