Lithium-lanthanum-titanium oxide sintered material, solid electrolyte containing the oxide, and lithium air battery and all-solid lithium battery including the solid electrolyte

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9711822
APP PUB NO 20150099197A1
SERIAL NO

14396955

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lithium-lanthanum-titanium oxide sintered material has a lithium ion conductivity 3.0×10−4 Scm−1 or more at a measuring temperature of 27° C., the material is described by one of general formulas (1−a)LaxLi2-3xTiO3-aSrTiO3, (1−a)LaxLi2-3xTiO3-aLa0.5K0.5TiO3, LaxLi2-3xTi1-aMaO3-a, Srx-1.5aLaaLi1.5-2xTi0.5Ta0.5O3 (0.55≦x≦0.59, 0≦a≦0.2, M=at least one of Fe or Ga), amount of Al contained is 0.35 mass % or less as Al2O3, amount of Si contained is 0.1 mass % or less as SiO2, and average particle diameter is 18 μm or more.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOHO TITANIUM CO LTDCHIGASAKI-SHI KANAGAWA 253-8510
THE GAKUSHUIN SCHOOL CORPORATION1-5-1 MEJIRO TOSHIMA-KU TOKYO 1718588
NAKASHIMA SANGYO CO LTD35 HIGASHIKOSETO-CHO SETO-SHI AICHI 489-0037

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inaguma, Yoshiyuki Tokyo, JP 17 72
Nakashima, Mamoru Yokohama, JP 7 15
Nakashima, Mikio Owariasahi, JP 52 644

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00