Hollow-core photonic crystal fiber gas cell and method for preparing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9709730
SERIAL NO

15393163

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hollow-core photonic crystal fiber gas cell and method for preparing the same. The hollow-core photonic crystal fiber gas cell comprises a single-mode fiber, a fiber splicing protection sleeve, a hollow-core photonic crystal fiber, and a photoelectric detector. One end of the single-mode fiber is fusion spliced with one end of the hollow-core photonic crystal fiber to form a fusion splice and seal one end of the hollow-core photonic crystal fiber gas cell. The fiber splicing protection sleeve covers and protects the fusion splice. The other end of the hollow-core photonic crystal fiber is processed into an output end by fusion sealing, and the surface of the output end faces, but is not parallel to, a detection surface of the photoelectric detector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHANGHAI INSTITUTE OF OPTICS AND FINE MECHANICS CHINESE ACADEMY OF SCIENCES201800 QINGHE ROAD 390 SHANGHAI JIADING DISTRICT SHANGHAI CITY SHANGHAI CITY 201800

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cai, Haiwen Shanghai, CN 3 4
Chen, Dijun Shanghai, CN 3 4
Chen, Weibiao Shanghai, CN 3 4
Chen, Zeheng Shanghai, CN 2 4
Geng, Jianxin Shanghai, CN 1 4
Yang, Fei Shanghai, CN 246 1238

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00