Method and apparatus for inspecting laminated iron core

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9709508
APP PUB NO 20160299087A1
SERIAL NO

15088620

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a method for inspecting a laminated iron core structured by laminating a plurality of iron core pieces-having a predetermined shape and including therein a cooling flow path allowing refrigerant to flow therethrough, the refrigerant being supplied and discharged through openings formed at different positions. The method includes arranging a light projecting part and a light receiving part of a photosensor in the openings of the cooling flow path, respectively, and detecting light from the light projecting part by the light receiving part to thereby inspect a penetrating state of the cooling flow path.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571
MITSUI HIGH-TEC INCFUKUOKA PREFECTURE FUKUOKA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsumoto, Masashi Aichi-ken, JP 116 619
Mizutani, Tatsuhiko Aichi-ken, JP 30 211
Shibuta, Tadashi Fukuoka, JP 3 8
Yamagishi, Yoshitada Aichi-ken, JP 18 105

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00