Unidirectional multi-path lumber kilns

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9709328
SERIAL NO

15284404

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments provide a unidirectional multi-path kiln with two or more chambers and generally parallel flow paths extending through the kiln, on opposite sides, from charge entry portals at a first end of the kiln to charge exit portals at a second end of the kiln. Moist heated air flowing from the second heated chamber is received in the first chamber and circulated around the lumber charges with one or more fans. The lumber charges proceed in the same direction on the flow paths through the heated second chamber, which may be an existing kiln. Charge exit portals at the distal end of the kiln and/or intermediate charge portals between the second chamber and a third chamber may be provided with insulating members configured to reduce airflow from the second chamber through the charge exit portals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
U S NATURAL RESOURCES INC1981 SHURMAN WAY WOODLAND WA 98674

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blomquist, Christopher W Ridgefield, US 30 144

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00