Superheated steam recycling apparatus and method for using same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9709262
APP PUB NO 20150276210A1
SERIAL NO

14673597

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A superheated steam recycling apparatus includes a superheated steam generating part; a steam supply flow path for supplying saturated steam to the superheated steam generating part; a superheated steam utilization part that is supplied with superheated steam generated by the superheated steam generating part; a steam return flow path for returning used steam having passed through the superheated steam utilization part to the superheated steam generating part; and a flowmeter that measures a flow rate of the used steam returned to the superheated steam generating part, and on the basis of the difference between a desired flow rate of the superheated steam to be generated by the superheated steam generating part and the flow rate of the used steam obtained by the flowmeter, controls a flow rate of the saturated steam to be supplied to the superheated steam generating part through the steam supply flow path.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOKUDEN CO LTDKYOTO-SHI KYOTO 607-8345

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujimoto, Yasuhiro Kyoto, JP 43 143
Tonomura, Toru Otsu, JP 31 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00