Method for constructing universal LED bulb and snap ring lens type LED bulb and LED lamp

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9709220
SERIAL NO

14416497

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a method for constructing a universal LED bulb (102), a snap ring lens type LED bulb (102) and a lamp. The constructing method includes: supporting an optical engine core member of the LED bulb using a lens snap ring (8) as the supporting main body, using a light distribution optical lens (7) as an auxiliary supporting structure, and further using the light distribution optical lens (7) as an installation base of the optical engine core member, or using the light distribution optical lens (7) as an installation base of an LED bulb radiator (103) in cooperation with an inner snap ring (81), wherein an installation flange is provided to the lens snap ring (8) for installing the LED bulb (102). The LED bulb (102) may be provided with the radiator (103) to independently work and may also be installed on the radiator (103) of the lamp.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GUIZHOU GZGPS CO LTDHONGTAISHIJIA28D SHINAN ROAD NANMING GUIYANG GUIZHOU 550002

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhang, Jiqiang Guizhou, CN 12 130
Zhang, Zheyuan Guizhou, CN 18 131

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00