Solar power plant construction method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9708139
APP PUB NO 20170137238A1
SERIAL NO

15116058

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A Solar power plant construction method includes a string formation step of arranging solar modules delivered to an assembly plant on support frames to form planar solar strings, a conveyance step of stacking the solar strings in a container and loading the container on a container truck to convey the container to a power plant site, and a solar string installation step of transferring the container delivered to the power plant site to a site machine and measuring distances and directions between a crane included in the site machine placed at a predetermined position of a stand array group for mounting solar array provided in the power plant site and stands to pull up the solar strings by the crane of the site machine to sequentially distribute the solar strings to respective stand positions measured in the stand position measurement step to form and fix a solar array.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MERS FORS CO LTD501 7-16 HIRAKAWA-CHO 1-CHOME CHIYODA-KU TOKYO 102-0093
CLEAN ENERGY FACTORY CO LTD149-12 KOMBUMORI NEMURO-SHI HOKKAIDO 088-1784

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kamata, Hiroyuki Tokyo, JP 69 421

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00