Long mission tethered aerostat and method of accomplishing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9708049
APP PUB NO 20130299629A1
SERIAL NO

13942683

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Apparatus and method for a continuous replenishing of the lift gas and maintaining the proper pressure and lift of a tethered medium altitude aerostat utilizing a novel feed tube running the entire length of the tether. A first end of the feed tube is connected to the aerostat while a second end is connected through a novel slip ring means to a pressure controlled helium ballast chamber and scrubber on the ground to maintain pressure and lift by a reversible compressing pump. A plurality of pressure and temperature sensors and tension gauges strategically placed inside and around the airship continuously monitor the temperature and pressure changes in the aerostat. A data retrieval and communication unit mounted on the aerostat collects measurement data from the pressure, temperature and tension sensors which is relayed to the ground station and the data is used to regulate lifting gas pressure inside the aerostat.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STRATOCOMM CORPNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Yee-Chun San Jose, US 16 644

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00