Railway car coupler and knuckle system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9707980
SERIAL NO

14647961

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A railway car coupler system includes a railcar coupler comprising a coupler head portion extending from a shank portion. The coupler head portion is configured to couple to a first coupler knuckle for coupling the railcar coupler to a second railcar coupler of an adjacent railcar. The coupler head portion comprises a coupler pivot pin hole for receiving a pivot pin for coupling the railcar coupler to the first coupler knuckle. The pivot pin hole has a longitudinal axis. The coupler head portion comprises top and bottom coupler pulling lugs each having a respective coupler pulling lug engagement face. At least one of the coupler pulling lug engagement faces of the top and bottom coupler pulling lugs is angled with respect to the longitudinal axis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MCCONWAY & TORLEY LLC109 48TH STREET PITTSBURGH PA 15201

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Float, Joseph Monroeville, US 1 5
Gagliardino, Joseph L Oakdale, US 18 305
Mautino, P Scott Pittsburgh, US 8 173

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00