Vehicle brake control apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9707945
SERIAL NO

14574875

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A brake system includes a master cylinder, a first solenoid valve, a stroke simulator, a slave cylinder apparatus, and a control apparatus. The master cylinder generates a brake hydraulic pressure in response to an operation on a brake operator. The first solenoid valve is provided between the master cylinder and a wheel brake. The stroke simulator is connected to the master cylinder through a second solenoid valve. The slave cylinder apparatus includes an electric actuator and a cylinder mechanism. The cylinder mechanism generates a brake hydraulic pressure. The control apparatus closes the first solenoid valve and opens the second solenoid valve when the brake hydraulic pressure is increased by the electric actuator. The control apparatus controls the electric actuator so that the larger a carried load on a vehicle is, the larger the brake hydraulic pressure is.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AUTOLIV NISSIN BRAKE SYSTEMS JAPAN CO LTD840 KOKUBU UEDA-CITY NAGANO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sakurazawa, Motoaki Nagano, JP 1 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00