Palm hammer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9707673
SERIAL NO

14378915

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A palm hammer comprises a bracket, a hammer body and the guide bushing which comprises a prism-shaped muzzle cover and a muzzle, wherein the muzzle cover and the muzzle are connected through bolts and joined into a body of the guide bushing; the body of the guide bushing may be axially moved in a bracket of the palm hammer; the parts of the muzzle cover and the muzzle near the distal gradually narrow into a chisel-shape; the proximal of the body of the guide bushing rests against a spring on the hammer body of the palm hammer; the body of the guide bushing axially moves in the bracket; a bore used for accommodating a nail and a driving rod is axially opened on the muzzle; one end of a bumper protrudes out of the distal of the body of the guide bushing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIZHOU DAIJIANG IND CO LTDMACHINERY & ELECTRONICS ZONE OF INDUSTRY CITY WENLING ZHEJIANG PROVINCE 317500

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yang, Mingjun Wenling, CN 54 69
Zhu, Zaijun Wenling, CN 8 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00