Die cushion force control method and die cushion device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9707612
APP PUB NO 20150185726A1
SERIAL NO

14572084

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There are provided a die cushion force control method and a die cushion device that can improve response delay of die cushion force without changing die cushion waiting position upward. In the die cushion force control method, a servo motor is driven according to a die cushion force command B previously set and the die cushion force is generated on the cushion pad. The die cushion force control method includes a step of allowing the cushion pad to wait in a predetermined die cushion waiting position at which a die cushion force action will start, and a preliminary pressurization step of outputting the die cushion force command B and preliminary applying pressure to the cushion pad before a slide of a press machine reaches the die cushion waiting position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIDA ENGINEERING LTDNO 10 NO 2 DASHAN TOWN GREEN DISTRICT XIANGMUYUAN CITY KANAGAWA PREFECTURE JAPAN SAGAMIHARA-SHI KANAGAWA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kohno, Yasuyuki Sagamihara, JP 40 304

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00