Snap hook

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9707419
SERIAL NO

14874871

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A snap hook that includes a body, a gate, a connection link and a breakable fastener is provided. A central portion of the body is positioned between an upper portion and a lower portion. The gate is pivotally coupled proximate the central portion of the body. The gate and the body selectively forming a closed configuration that defines a hook connection passage and an open configuration that provides access to the hook connection passage. An upper end of the connection link is pivotally coupled proximate the central portion of the body. A lower end of the connection link includes a body connection aperture. The breakable fastener couples the lower end of the connection link proximate the lower portion of the body. The breakable fastener is configured to break when a select amount of force is applied to the lower end of the connection link to transfer the force from the lower portion of the body to the central portion of the body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
D B INDUSTRIES LLC3833 SALA WAY RED WING MN 55066

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Perner, Judd J Red Wing, US 29 345

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00