Protection circuit for preventing an over-current from an output stage

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9705315
SERIAL NO

14685611

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device including: an output stage, including a PMOS, an NMOS and an output terminal, wherein a source terminal of the PMOS is connected to a first supply voltage, a drain terminal of the PMOS is connected to a drain terminal of the NMOS and the output terminal, a source terminal of the NMOS is connected to a second supply voltage, and the output terminal outputs an output signal; and a protection circuit, including a first voltage clamping circuit, including a first transistor, a second transistor and a first switch, wherein the first transistor and the second transistor are for clamping a gate voltage of the PMOS of the output stage and are connected in series, the first switch is coupled to the first supply voltage and a node between the first transistor and the second transistor for selectively coupling the first supply voltage to the node.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELITE SEMICONDUCTOR MEMORY TECHNOLOGY INCNO 23 GONGYE E 4TH RD EAST DIST HSINCHU CITY 300

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tsao, Szu-Chun Yilan County, TW 31 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00