Integrated device having multiple transistors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9704858
SERIAL NO

14795622

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated device includes a semiconductor well formed in an epitaxial layer, and a guard ring formed in the epitaxial layer and surrounding the semiconductor well. The semiconductor well and the guard ring include a type of semiconductor different from that of the epitaxial layer. The integrated device also includes an insulating layer formed atop the guard ring, and multiple gate electrodes formed on a top surface of the insulating layer, overlapping the guard ring and surrounding the semiconductor well. The gate electrodes include a first gate electrode and a second gate electrode separated by a gap. An intersecting line between the top surface of the insulating layer and a side wall of the first gate electrode partially overlaps an area that is defined based on an intersecting line between the top surface of the insulating layer and a side wall of the second gate electrode above the guard ring.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UBS AG SINGAPORE BRANCH AS SECURITY AGENT9 PENANG ROAD SINGAPORE 238459

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lipcsei, Laszlo Campbell, US 68 613
Lu, Hamilton Los Angeles, US 10 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00