Device and method for verifying CNC production accuracy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9703286
APP PUB NO 20150120032A1
SERIAL NO

14520844

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a production accuracy verification method to verify a production program installed in a computer numerical control (CNC) machine, wherein the production program is used to produce a product, coordinates of points on an ideal processing path of the production program are obtained to fit a first curve. A CAD model of the product is obtained, and outlines of the product are extracted in the CAD model. A normal vector of each of the outlines is computed and to be adjusted, making the normal vectors of the outlines pointing to a same direction. First distances between points in the first curve and corresponding points in the second curve are computed, and whether the production program is accurate can be determined by comparing whether each of the first distances is within a first predetermined tolerance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHENZHEN AIRDRAWING TECHNOLOGY SERVICE CO LTD10F RONGQUN BUILDING NO 83 LONGGUAN EAST RD LONGHUA NEW DIST SHENZHEN GUANGDONG CHINA SHENZHEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Chih-Kuang New Taipei, TW 307 961
Wu, Xin-Yuan Shenzhen, CN 152 502
Xie, Peng Shenzhen, CN 88 1281

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00