Optical modulator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9703169
APP PUB NO 20150378237A1
SERIAL NO

14764678

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An aspect of the present invention is an optical modulator, comprising a waveguide substrate and a multiplexing optical system. The waveguide substrate includes a first modulation portion, a second modulation, a first optical path and a second optical path. The multiplexing optical system includes a first surface and a second surface. First output light output from the first optical path and second output light output from the second optical path are input from the first surface and are output after there are combined at a combining point of the second surface. An optical path length between the first surface and the combining point in the first output light is larger than that of in the second output light. An optical path length between the first modulation portion and the first surface and an optical path length between the second modulation portion and the first surface are different.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO OSAKA CEMENT CO LTDTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hara, Tokutaka Tokyo, JP 23 93
Okamura, Miki Tokyo, JP 4 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00