Erosion control equipment pads and accessories

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9702106
SERIAL NO

14279544

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A prefabricated outdoor support pad is configured for transport from factory to field and above-grade installation on level ground to support a condenser or transformer. A flexible geosynthetic material is joined to the rigid platform along a perimeter and corners of the rigid platform. Upon installation, the geosynthetic material is inserted into the ground, forming an erosion-resisting barrier. Erosion control kits are also provided for outdoor condenser or transformer support pads. One type of the kit comprises a flexible geotextile soil retention barrier sized for attachment to the support pad and insertion into the ground and mechanical attachment members. Another type of the kit comprises a hard-walled ground-insertable soil retention barrier configured to wrap around soil under at least a corner of the support pad when the support pad is placed on grade and mechanical attachment members configured to attach the soil retention barrier to the support pad.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
J F R ENTERPRISES INC160 SURREY PARK CT JOHNS CREEK GA 30097

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rowland, Jay F Johns Creek, US 19 131

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00