Apparatus and method for producing a graphene material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9702050
APP PUB NO 20160186341A1
SERIAL NO

14976267

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for producing a graphene material includes a tank, a container, an agitating module, a second electrode disposed in the tank, and a power supply module. The container is used for receiving a graphite material, and is formed with a plurality of through holes for the electrolyte solution to pass therethrough. The agitating module includes a control unit and an agitating unit used as a first electrode, and inserted into the container for agitating the electrolyte solution and the graphite material. The power supply module is electrically connected to the agitating unit and the second electrode for supplying electric power to generate an electrical potential difference.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL TAIWAN NORMAL UNIVERSITYTAIPEI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Sheng-Chang Taipei, TW 13 163
Chang, Shu-Fang New Taipei, TW 4 26
Chen, Yu-Ting Taoyuan, TW 117 711
Chen, Zi-Ying New Taipei, TW 1 0
Huang, Meng-Hung Kaohsiung, TW 1 0
Teng, Tun-Ping New Taipei, TW 7 0
Yang, Chii-Rong Taipei, TW 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00