Reinforced UV-A curable composite compositions and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9701802
SERIAL NO

12420112

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure is directed to a process for forming a reinforced ultraviolet (UV) radiation-curable composite. The composite may be formed by applying reinforcing layers and resin layers to a substrate. The resin composition may include an aliphatic urethane acrylate oligomer, a polyfunctional acrylate monomer, and a photoinitiator. The composite formed on the substrate may be exposed to UV radiation to cure the composite on the substrate. The composite may be characterized in that it is cured within 10 minutes of exposure to UV radiation and does not exhibit oxygen inhibition effects, such as, for example, surface tack. The reinforced UV-curable composite may find utility, for example, as a rapid field repair patch in aerospace applications, among others.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALLNEX NETHERLANDS B V4612 RB BERGEN OP ZOOM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bushmire, Alan D McDonald, US 16 45
Clatty, Jan L Moon Township, US 10 142
Dvorchak, Michael J Monroeville, US 20 183
Gambino, Charles A McDonald, US 21 149
Mebane, Christine Braddock, US 4 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00