Carbon dioxide conversion system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9701593
SERIAL NO

15147522

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A CO2 conversion system includes at least a first reactor including a gas mixing tube, a spark ignition system for generating sparks in the gas mixing tube coupled to a catalyst chamber having a catalyst therein coupled to a reaction chamber. Inlet tubes each with gas flow control valves are for injecting process gases including O2, H2 and CO2 into the gas mixing tube, wherein the process gases react in the reaction chamber in at least one chemical reaction to form reaction products including output gases including CH4 and reaction heat. A process controller utilizes at a process temperature setpoint or a criteria for an output gas to control a temperature in the catalyst chamber to maintain the process temperature setpoint or output gas criteria by adjusting gas flow control valves for changing the mass flow of at least one process gas to reduce a heat from the chemical reaction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BB&G ENVIRONMENTAL LLC3220 SW 118TH COURT MIAMI FL 33175

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fowler, David W Orange Beach, US 9 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00