Method for producing chiral metal oxide structure, and chiral porous structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9701545
APP PUB NO 20150291440A1
SERIAL NO

14438872

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a chiral metal oxide structure, involves a sol-gel step of allowing a transition metal compound having a bi- or higher dentate chelate ligand to act on a chiral supramolecular crystal of an acid-base complex containing a polymer having a linear polyethyleneimine skeleton and a chiral dicarboxylic acid compound having two carboxyl groups and four or more carbon atoms to form a metal oxide layer on a surface of the chiral supramolecular crystal; and a calcination step of thermally decomposing the organic chiral supramolecular crystal after the sol-gel step to generate a transition metal oxide structure composed of the metal oxide layer prepared with the supramolecular crystal as a template.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KANAGAWA UNIVERSITY3-27-1 ROKKAKUBASHI KANAGAWA-KU YOKOHAMA-SHI KANAGAWA 2218686

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jin, Ren-Hua Kanagawa, JP 29 299
Matsukizono, Hiroyuki Kanagawa, JP 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00