Energy harvester, wireless sensor device having the energy harvester, and system for monitoring railroad vehicle using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9701325
SERIAL NO

14927861

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A railroad vehicle monitoring system installed on a railroad vehicle includes: wireless sensor devices installed at attached equipment of the railroad vehicle, including a sensor that senses statuses of the attached equipment, configured to wirelessly transmit a sensing value sensed by the sensor in real time, and including an energy harvester configured to convert energy generated by running of the railroad vehicle into electric energy, and supply the electric energy as a power source for the sensor, a signal process in the sensing value, and wireless communication of the sensing value; sink node devices configured to wirelessly receive the sensing value and output, in real time, railroad vehicle status information obtained by integrating the received sensing value; and a vehicle status monitoring device configured to receive the railroad vehicle status information, integrate and manage the railroad vehicle status information, and output the integrated railroad vehicle status information in real time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA RAILROAD RESEARCH INSTITUTE176 CHEOLDOBANGMULGWAN-RO UIWANG-SI 437-757

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Jaehoon Goyang-si, KR 90 386
Kim, Young Il Daejeon, KR 175 1725
Lee, Jae Yun Yongin-si, KR 9 97
Lee, Kwan Sup Uiwang-si, KR 5 30
Yeo, Kun Min Daejeon, KR 2 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00