Signal processor and detector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9698915
SERIAL NO

15166916

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method for processing an input signal includes a non-linear material component for receiving the signal. The non-linear material component is selected to mix the input signal with an optical pump wave to output an optical signal. The system also includes a parametric amplifier coupled to the non-linear material to obtain the optical signal and to amplify the optical signal to generate an amplified signal and an amplified idler which is a conjugate image of the amplified signal. The system also includes a frequency converter, to obtain the amplified signal and the amplified idler from the parametric amplifier and to convert the amplified signal and the amplified idler into a first output and a second output. The system also includes a first spectral sampling and processing apparatus to obtain and process the first output.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PERSPECTA LABS INC150 MOUNT AIRY ROAD BASKING RIDGE NJ 07920

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Agarwal, Anjali Basking Ridge, US 22 324
Dailey, James Basking, US 11 73
McKinstrie, Colin Basking Ridge, US 6 31
Peters, Nicholas Knoxville, US 14 211
Toliver, Paul Basking Ridge, US 20 340

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 4, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 4, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00