Rail segment for handguard of a firearm and assembly thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9696112
SERIAL NO

15093419

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A handguard assembly for a firearm is provided, comprising a handguard configured to overlie a barrel of the firearm in spaced relationship, the handguard comprising a plurality of apertures; a rail segment including a plurality of mounting bosses, each of the plurality of mounting bosses located in a different one of the plurality of apertures of the handguard; a plurality of rotatable fasteners to fasten the rail segment to the handguard, each of the rotatable fasteners located in a different one of the mounting bosses of the rail segment; and each of the rotatable fasteners comprising a mounting latch to mount the rail segment to the handguard, each mounting latch rotatable from an aperture insertion position overlying a top of the boss to a mounting position overlying the handguard.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TROY INDUSTRIES INC151 CAPITAL DRIVE WEST SPRINGFIELD MA 01089

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gottzmann, Alexander M Longmeadow, US 3 45
Morin, Gary R Hardwick, US 4 93
Troy, Stephen P West Springfield, US 34 1097

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 4, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 4, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00