Concentrating components of fluid circulated through a cell growth chamber

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9695393
APP PUB NO 20140051167A1
SERIAL NO

13971652

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

One or more embodiments are described directed to a method and system for concentrating components of a fluid circulated through a cell growth chamber such as a cell growth chamber. Accordingly, embodiments include methods and systems that utilize a tangential flow filter to concentrate components of a fluid that in embodiments includes expanded cells. In embodiments, a concentrated fluid component and a concentrated cell component are generated by flowing the fluid with expanded cells across a tangential flow filter. The concentrated cell component may be recirculated to the tangential flow filter to reach some desired concentration of cells. The concentrated fluid component may be collected to utilize cellular-produced constituents in the concentrated fluid component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TERUMO BCT INC10811 WEST COLLINS AVENUE LAKEWOOD CO 80215

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
DiLorenzo, Thomas G Arvada, US 13 111
Jones, Mark E Littleton, US 57 1490
Kinzie, Michael E Lafayette, US 10 107
Nankervis, Brian J Thornton, US 27 193

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 4, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 4, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00