More energy efficient C5 hydrogenation process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9695096
APP PUB NO 20140018584A1
SERIAL NO

13547164

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for the conversion of linear pentenes to propylene is disclosed. The process may include feeding hydrogen and a C5-olefin containing stream comprising linear pentenes, dienes, acetylenes, and cyclopentene to a catalytic distillation reactor system. Concurrently in the catalytic distillation reactor system, the acetylenes and dienes may be hydrogenated and the C5-olefin containing stream may be fractionated, thereby recovering an overheads fraction comprising the linear pentenes, a side draw fraction comprising the cyclopentene, and a bottoms fraction. In some embodiments, at least a portion of the overheads fraction may then be fed to a metathesis reactor for converting the linear pentenes to propylene.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LUMMUS TECHNOLOGY INC1515 BROAD STREET BLOOMFIELD NJ 07003-3096

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Podrebarac, Gary G Pasadena, US 39 424
Xu, Yongqiang Pasadena, US 35 107

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 4, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 4, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00