Reverse osmosis system with energy recovery devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9695064
APP PUB NO 20130277310A1
SERIAL NO

13865257

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A reverse osmosis system according to the present disclosure includes a first membrane array, a second membrane array, a hydraulic pressure booster, and a motor-generator. The first membrane array is configured to generate a first permeate stream and a first brine stream from a feed stream. The second membrane array is configured to generate a second permeate stream and a second brine stream from the first brine stream. The booster is configured to use energy from the second brine stream to increase pressure of at least one of the feed stream and the first brine stream. The motor-generator is coupled to the hydraulic pressure booster and is operable to use energy from a power supply to drive the hydraulic pressure booster. The motor-generator is also operable to use energy from the second brine stream to provide power to the power supply.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FLUID EQUIPMENT DEVELOPMENT COMPANY LLC800 TERNES DRIVE MONROE MI 48162

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Okeljas,, Jr Eli Newport, US 1 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 4, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 4, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00