Slide rail

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9694719
APP PUB NO 20150217661A1
SERIAL NO

14612747

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A slide rail by which a conveyance seat is slidably coupled to a floor of a conveyance includes: a lower rail attached on the floor; an upper rail slidably assembled to the lower rail and attached to the conveyance seat; and a locking spring supported by the upper rail and having a locking piece that is inserted into a locking slit formed in the lower rail to prohibit the upper rail and the lower rail from sliding relative to each other. The locking piece extends in a direction along a cross-section (the width direction) of the upper rail from a position in the locking spring, at which the locking spring is supported by the upper rail. The locking piece is inserted into the locking slit by deflection deformation of the locking piece in an in-plane direction of the cross-section (the height direction) of the upper rail.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOYOTA BOSHOKU KABUSHIKI KAISHA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mizobata, Hiroshi Seto, JP 48 420
Takiya, Kouji Toyota, JP 1 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 4, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 4, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00