Integrated step and jump exercise device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9694224
APP PUB NO 20170182343A1
SERIAL NO

14982654

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An exercise device includes a first tubular frame having a flexible fabric attached thereon, a second tubular frame having a rigid board mounted thereon, and at least three elongate support members disposed between and separate the first tubular frame and the second tubular frame. Each of the elongate members includes a first end fixedly mounted on the first tubular frame and a second end fixedly mounted on the second tubular frame, such that a first cross plane of the first tubular frame is substantially parallel to a second cross plane of the second tubular frame. When the second tubular frame is placed on a substantially flat surface, the exercise device can be used as a jumping exercise device. When the first tubular frame is placed on the substantially flat surface, the exercise device can be used as a stepping exercise device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HO WEI-TEHTAIPEI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ho, Wei-Teh Taipei, TW 116 1114
Ho, Willy Wei Yu Taipei, TW 39 341

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 4, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 4, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00