Process for preparing graphene on a SiC substrate based on metal film-assisted annealing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9691612
APP PUB NO 20140367642A1
SERIAL NO

14369780

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a process for preparing graphene on a SiC substrate, based on metal film-assisted annealing, comprising the following steps: subjecting a SiC substrate to a standard cleaning process; placing the cleaned SiC substrate into a quartz tube and heating the quartz tube up to a temperature of 750 to 1150° C.; introducing CCl4vapor into the quartz tube to react with SiC for a period of 20 to 100 minutes so as to generate a double-layered carbon film, wherein the CCl4 vapor is carried by Ar gas; forming a metal film with a thickness of 350 to 600 nm on a Si substrate by electron beam deposition; placing the obtained double-layered carbon film sample onto the metal film; subsequently annealing them in an Ar atmosphere at a temperature of 900 to 1100° C. for 10-30 minutes so as to reconstitute the double-layered carbon film into double-layered graphene; and removing the metal film from the double-layered graphene, thereby obtaining double-layered graphene. Also provided is double-layered graphene prepared by said process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XIDIAN UNIVERSITY710071 XI'AN ELECTRONIC AND SCIENCE UNIVERSITY 2 TAIBAI SOUTH ROAD SHAANXI XI'AN XI'AN CITY SHAANXI PROVINCE 710071

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deng, Pengfei Xi'an, CN 4 410
Guo, Hui Xi'an, CN 203 1379
Lei, Tianmin Xi'an, CN 3 414
Zhang, Keji Xi'an, CN 4 417
Zhang, Yuming Xi'an, CN 45 756

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00