Hybrid passive device and hybrid manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9691540
APP PUB NO 20160182005A1
SERIAL NO

14736653

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid passive device for synergizing at least one passive component which resides in at least one technology is provided. The hybrid passive device includes a first passive component and a second passive component. The first passive component resides in a first technology of the at least one technology and/or a second technology of the at least one technology, the second technology is different from the first technology, and a technology boundary is arranged between the second technology and the first technology. The second passive component of the at least one passive component is different from the first passive component. The second passive component resides in the first technology and/or the second technology, and the first passive component and the second passive component are electromagnetically coupled to each other through the technology boundary.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MEDIATEK INCNO 1 DUSING RD 1ST SCIENCE-BASED INDUSTRIAL PARK HSIN-CHU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Tao-Yi Hsin-Chu, TW 9 9
Tsai, Ming-Da Houlong Township, Miaoli County, TW 44 236
Tseng, Po-Sen Cyonglin Township, Hsinchu County, TW 14 99

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00