Optical apparatus and manufacturing method using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9690200
APP PUB NO 20160097981A1
SERIAL NO

14867292

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical apparatus and a manufacturing method using the optical apparatus are disclosed. The optical apparatus includes a stage supporting a substrate, first optical systems providing a first light onto the substrate, a gantry supporting the first optical systems to transfer them on the stage, and second optical systems disposed between the gantry and the stage and detecting displacement of the first optical systems. Each of the second optical systems includes a beam source generating a second light different with the first light, and sensor arrays for sensing the second light provided to the first optical systems to detect displacement of the first optical systems.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTD129 SAMSUNG-RO YEONGTONG-GU GYEONGGI-DO SUWON-SI 16677
SAMSUNG DISPLAY CO LTD1 SAMSUNG-RO GIHEUNG-GU YONGIN-SI GYEONGGI-DO 17113
KNU-INDUSTRY COOPERATION FOUNDATION(HYOJA-DONG) 1 KANGWONDAEHAK-GIL CHUNCHEON-SI GANGWONDO 24341

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Inbae Seoul, KR 2 4
Hong, Sangjoon Seoul, KR 3 1
Jang, Sangdon Suwon-si, KR 4 10
Lee, Hikuk Yongin-si, KR 6 18
Lee, Jongjin Seoul, KR 42 140

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00