Tubular bodies and methods of forming same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9689513
APP PUB NO 20140318663A1
SERIAL NO

14355483

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a tubular article (10), such as may be used as an oil and gas pipeline, having a longitudinal axis X comprising inner and outer separate strips (12, 14) of spirally wound overlapping material each having a longitudinal axis L and first and second edges (16, 18, 16′, 18′), in which each strip (12, 14) comprises two or more longitudinally extending ridges (20, 22, 20′, 22′), each of which extends along said longitudinally extending axis L in parallel to each other and in which said ridges (20, 22, 20′, 22′) each comprise asymmetric ridges having a leading edge (24, 24′) forming a contact portion (28, 28′) and wherein said leading edges (24, 24′) are each in contact with each other and further comprising a non-contact trailing edge portion (26, 26′) which are spaced from each other by an amount G.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ITI SCOTLAND LIMITEDATRIUM COURT 50 WATERLOO STREET GLASGOW G2 6HQ

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Stevenson, Andrew Hertfordshire, GB 32 806

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00