Filling system for filling in powder and method for filling in powder

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9688424
APP PUB NO 20140158251A1
SERIAL NO

14099930

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A filling system for filling powder into a target container to be sealed has a metering device for metering a partial quantity of the powder to be filled in. A compaction element for the powder is arranged below the metering device. The compaction element can be lowered from above into the target container. The compaction element is a shaking element with a shaking drive. During filling of the target container with the powder, the shaking element at least partially projects from above into the target container. The shaking element has a bottom edge provided with a shaking projection, wherein the shaking projection, beginning at the bottom edge, extends downwardly. During filling of the target container with the powder, only the shaking projection of the shaking element projects from above into the target container and the shaking element as a whole does not contact the target container.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HARRO HOEFLIGER VERPACKUNGSMASCHINEN GMBHALLMERSBACH IM TAL

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Meyer, Hermann Weissach im Tal, DE 29 132
Thienst, Andreas Backnang, DE 6 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00