Methods for increasing cycle life of metal liners and products manufactured therefrom

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9687902
SERIAL NO

13623259

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of incremental autofrettage is taught herein, whereby the cycle life of a metal liner in a pressure vessel is increased. This method serves to increase the yield strength of the metal liner through sequential work hardening due to repeated autofrettage at increasing pressures. By incrementally increasing the internal pressure used in the autofrettage process, the compressive stresses at an inner surface of the metal liner may be controlled so that post-pressurization buckling does not occur, yet the yield strength of the metal liner is substantially increased. The higher compressive stresses in the metal liner mean that higher Maximum Expected Operating Pressures (MEOPs) may be used without detracting from the cycle life of the metal liner, or alternatively, for lower pressures, a longer metal liner cycle life may be obtained. Either internal or external pressures may be used, generated by a pressure source, or a suitable die.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SPENCER COMPOSITES CORPORATION4550 PELL DRIVE SACRAMENTO CA 95838

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grover, Richard L Whittier, US 11 199
Spencer, Brian E Sacramento, US 46 420
Spencer, Zachary B Sacramento, US 18 67

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00