Shredder jam clear apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9687854
APP PUB NO 20160271617A1
SERIAL NO

14663422

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A paper shredder having shredder cover and a motor coupled to shredder blades includes a shredder throat coupled to an inlet in the shredder cover and in proximity to shredder blades. The shredder throat has a moveable throat blade, which widens the shredder throat. An anti-jam switch, which when activated causes the motor to advance the shredder blades to clear a jam in the widened shredder throat. The jam clearing mechanism can be automatic or manual, as by push-button or turn-knob linkages. A method for recovering from a shredder jam in a paper shredder is provided, including providing a moveable throat blade; sensing a shredder throat jammed condition; releasing the moveable throat blade; moving the moveable throat blade to a wide gap position; sensing the moveable throat blade in the wide gap position; advancing shredder blades in response to the sensing, by which the jammed condition is cleared.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AURORA OFFICE EQUIPMENT CO., LTD. SHANGHAI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Xiuming Shanghai, CN 10 8
Tsai, Chung Shih Hawthorne, US 21 16
Tso, Yung Kang Shanghai, CN 21 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00