Adiabatic multi-bed catalytic converter with inter-bed cooling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9687801
APP PUB NO 20150352510A1
SERIAL NO

14760829

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-bed catalytic converter (1) with inter-bed heat exchangers, comprising a plurality of superimposed catalytic beds and a common heat exchanger (5) which is shared between two or more consecutive catalytic beds, said common heat exchanger including heat exchange bodies such as a tube bundle (6), and a wall system (9, 10) to define a tube side and a shell side respectively, and the shell side comprising at least a first space (12) and a second space (13), wherein the first space (12) receives the product gas leaving the first of said consecutive beds, and the inter-cooled gas leaving said first space (12) is admitted in the second bed (3-3) for further conversion, and a sealing means (14) preventing a direct gas passage from said first space to said second space.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CASALE SAVIA GIULIO POCOBELLI 6 LUGANO-BESSO CH-6900

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Filippi, Ermanno Castagnola, CH 124 498
Rizzi, Enrico Casnate con Bernate (CO), IT 88 325

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00