Molded coolant plate assembly with integral reactant flow fields and thermal dam

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9685666
APP PUB NO 20140255811A1
SERIAL NO

14352730

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An end-cooler assembly for a fuel cell includes a cooler having a coolant tube array. A composite material includes flake graphite and hydrophobic polymer. The composite material surrounds the coolant tube array and provides a first side. A flow field is formed in the first side. A thermal dam is embedded in and is entirely surrounded by the composite material. The thermal dam is arranged between the coolant tube array and the flow field. The coolant tube array, composite material, flow field and thermal dam comprise a unitary, monolithic structure bound together by the composite material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYAXIOM INC101 EAST RIVER DRIVE 7TH FLOOR EAST HARTFORD CT 06108

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Breault, Richard D North Kingstown, US 90 1209
Kanuri, Sridhar V Milford, US 9 19
Livaich, Eric A South Windsor, US 1 0
Tenneti, Kishore K Manchester, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00