Load port device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9685359
SERIAL NO

14199051

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A load port device comprises a link mechanism that has a main moving link whose one end is connected with a door holding member in a rotatable manner, a guide that bends and extends from a horizontal direction to a vertical direction and that guides one end of the main moving link, a main moving block with which the other end of the main moving link is connected in a rotatable manner and a door hoisting shaft that extends in the vertical direction and that moves the main moving block in the extending direction. The link mechanism allows the end of the main moving link to move from the horizontal direction to the vertical direction or from the vertical direction to the horizontal direction along the guide in a state that the other end of the main moving link moves to the vertical direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SINFONIA TECHNOLOGY CO LTD1-30 SHIBADAIMON 1-CHOME MINATO-KU TOKYO 1058564

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Funato, Manabu Tokyo, JP 3 1
Natsume, Mitsuo Tokyo, JP 13 479
Ochiai, Mitsutoshi Tokyo, JP 10 128

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00