Debris resistant thrust bearing assembly for high speed hydraulic centrifugal turbines and pumps

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9683574
APP PUB NO 20150043845A1
SERIAL NO

14468989

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rotating assembly adapted for use in turbines and pumps is provided. The rotating assembly includes a shroud that rotates around a central axis and a disk seated in a recess in the shroud so that the disk rotates with the shroud, the disk being oriented perpendicular to the central axis. The rotating assembly also includes a stationary element in which at least one surface of the disk contacts a fluid so that when the fluid flows under pressure, the surface of the disk resists the generation of drag between the surface and the stationary element of the rotating assembly. A shroud is provided that includes a circular recess with a cavity on an outer perimeter extending away from the fixed assembly. A method of manufacturing a rotating assembly is provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENERGY RECOVERY INCSAN LEANDRO CALIFORNIA 94577

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Calkins, Jeffrey Michael Petersburg, US 2 42
Winkler, Felix Oakland, US 27 539

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00