Steam reflow apparatus and steam reflow method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9682438
APP PUB NO 20160167148A1
SERIAL NO

14966602

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A steam reflow apparatus includes a heating furnace including a preheating zone, a uniform heating zone, a melting zone and a cooling zone to which superheated steams are respectively supplied. The apparatus further includes a furnace-inlet-side dew condensation prevention zone and a furnace-outlet-side dew condensation prevention zone, to which air or nitrogen gas with 100° C. or higher heated by a heater is supplied, respectively adjacently provided with an upstream side of the preheating zone and a downstream side of the cooling zone. Atmospheric pressures of the furnace-inlet-side dew condensation prevention zone and the furnace-outlet-side dew condensation prevention zone are higher than atmospheric pressures of the preheating zone and the cooling zone.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KNE KABUSHIKI KAISHA9-20 TSUNABAMACHI HAKATA-KU FUKUOKA-SHI FUKUOKA 812-0024
SS TECHNO INC433-6 TERAFUKUDOU OGOORI-SHI FUKUOKA 838-0138

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nagao, Kazuhide Fukuoka, JP 34 426
Oyama, Kenshu Ogoori, JP 9 264

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00