Gas stream treatment process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9682383
APP PUB NO 20120263634A1
SERIAL NO

13269206

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process of treating a gas stream containing at least one mercury compound or species, the process comprising: applying a composition into said gas stream ahead of a particulate matter collection device, wherein said composition contains a compound having the following formula (SiO2)x(OH)yMzSaF, wherein (i) SiO2 is an optional component; (ii) M comprises at least one of the following: boron, magnesium, aluminum, calcium, titanium, vanadium, manganese, iron, cobalt, nickel, copper, zinc, zirconium, molybdenum, palladium, silver, cadmium, tin, platinum, gold, and bismuth; (iii) S comprises a sulfur-based species selected from at least one of the following: sulfide salts, dithiocarbamates, polymer-based dithiocarbamates, and polysulfide salts; (iii) F is an optional component and comprises at least one of the following: a functionalized organosilane, a sulfur-containing organosilane, an amine-containing organosilane, and an alkyl-containing organosilane.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ECOLAB USA INC1 ECOLAB PLACE SAINT PAUL MN 55102

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ergang, Nicholas S Glen Ellyn, US 22 112
Keiser, Bruce A Plainfield, US 50 499
Mimna, Richard Aurora, US 14 89

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00