Cage assembly for tibial tuberosity advancement procedure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9681957
APP PUB NO 20150335439A1
SERIAL NO

14442871

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cage assembly for implanting between and securing together two portions of bone in a tibial tuberosity advancement includes an elongated cage body having a first end and a second end, and a securing member. The first end of the cage body and the securing member are engagable with each other so as to interlock in a manner that prevents the securing member from moving longitudinally away from the cage body. The securing member is arrangable, when interlocked with the cage body, such that it has a portion which extends laterally outwards beyond each opposing side of the cage body for use in attaching the securing member to the portions of bone. Different sizes of securing member may be engaged with the cage body. The cage assembly therefore provides a convenient and flexible approach to tibial tuberosity advancement procedures.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VETERINARY ORTHOPEDIC IMPLANTS LLC310 COMMERCE LAKE DRIVE SUITE 107 ST AUGUSTINE FL 32095

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wotton,, III Harold M Woodstock, US 10 163

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00