Composite substrate, piezoelectric device, and method for manufacturing composite substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9680083
APP PUB NO 20150091416A1
SERIAL NO

14565902

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite substrate 10 includes a piezoelectric substrate 12 and a support layer 14 bonded to the piezoelectric substrate 12. The support layer 14 is made of a material having no crystalline anisotropy in a bonded surface thereof and has a smaller thickness than the piezoelectric substrate 12. The piezoelectric substrate 12 and the support layer 14 are bonded together with an adhesive layer 16 therebetween. The composite substrate 10 has a total thickness of 180 μm or less. The base thickness ratio Tr=t2/(t1+t2) is 0.1 to 0.4, where t1 is the thickness of the piezoelectric substrate 12, and t2 is the thickness of the support layer 14. The thickness t1 is 100 μm or less. The thickness t2 is 50 μm or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NGK INSULATORS LTDJAPAN'S AICHI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hamajima, Akira Nagoya, JP 19 117
Hori, Yuji Owariasahi, JP 128 1548
Nakahara, Toshinao Kasugai, JP 2 13
Tai, Tomoyoshi Inazawa, JP 57 806

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00