Methods for manufacturing integrated multi-layer magnetic films

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9679958
SERIAL NO

15082260

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods of manufacture of integrated multi-layer magnetic films for use in passive devices in microelectronic applications. Soft ferromagnetic materials exhibiting high permeability and low coercivity are laminated together with insulating layers interposed. Electrical conductors coupled to interconnects are magnetically coupled to magnetic film layers to engender an inductor (self and mutual). Soft ferromagnetic materials are provided in an alternating array of parallel plate capacitors. Each alternating magnetic film is electrically coupled to either a primary or secondary electrical conductor interconnects and separated by an electrically insulating dielectric material. Alternatively, each alternating magnetic layer comprises an induced anisotropy material, which can also be combined with coiled conductor giving rise to a hybrid inductive/capacitive device. Also, soft ferromagnetic material are also selected and tuned to provide for FMR notch filtering.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FERRIC INC150 W 30TH ST #1105 NEW YORK NY 10001

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Davies, Ryan New York, US 28 137
Sturcken, Noah Andrew New York, US 14 157

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00