Grid plate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9677816
APP PUB NO 20130130188A1
SERIAL NO

13700900

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A grid plate for the transporting and cooling of very hot materials leaving a furnace is provided. The plate includes cavities of rectangular shape, the largest dimension being perpendicular to the direction of advance of the materials. The cross section of these cavities being triangular with a fin-shaped bottom terminating in a turned-up end of reverse slope, the slope (α) of the cavities being between 10° and 45°, preferably between 20° and 30°, to the horizontal and the reverse slope (β) of the turned-up end making an angle equal to or up to 6° less than the angle of the slope of the cavities. The flow of material under gravity through the air injection slits is interrupted. Any contact of the material with the framework and with the mechanism of the equipment is avoided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAGOTTEAUX INTERNATIONAL S ARUE ADOLPHE DUMONT VAUX-SOUS-CHEVREMONT 4051

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pirard, Regnier Ougree, BE 2 4
Vielvoye, Christophe Fleron, BE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00