Tensioning or guide rail having a continuous recessed sliding body

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9677647
APP PUB NO 20160097439A1
SERIAL NO

14852297

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tensioning or guide rail for a drive chain, in particular for a chain drive of an internal combustion engine, comprises a carrier body with at least two chain guide sections and with at least one recessed section. The at least one recessed section is arranged between two chain guide sections and recessed relative to a tangent connecting the adjoining chain guide sections, the at least two chain guide sections having each a sliding-contact surface for contacting the drive chain. A continuous sliding body is arranged on the carrier body along the at least two chain guide sections and the at least one recessed section, the sliding body defining the sliding-contact surfaces of the at least two chain guide sections and a surface of the at least one recessed section, the surface facing the drive chain.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IWIS MOTORSYSTEME GMBH & CO KGALBERT-ROSSHAUPTER-STRASSE 53 MÜNCHEN 81369

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Geibel, Henning Wessling, DE 10 72
Perissinotto, Renzo Munich, DE 21 140

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00